Klade Get in touch

Commercial solar leads · Munster

Qualified commercial solar leads for Ireland.

Building-level solar models for tier-2 and tier-3 installers in Munster. Powered by Google Solar API, derated for Irish commercial reality, delivered with the data you need to act.

Email us about the beta
Cropped detail of a commercial solar panel layout generated from Google Solar API on a Munster pharma facility roof.

Overture · building footprint

~18,200 m² · industrial
confidence high · single polygon

Google Solar API · response

{
  "maxPanelsCount": 1812,
  "panelCapacityWatts": 400,
  "yearlyEnergyDcKwh": 832000,
  "azimuthDegrees": 180,
  ...
}

Tailte Éireann · property record

Use class Industrial · pharma
Tenure Freehold
County Limerick
Eircode V94 · · · ·

01 · Identify

High-potential commercial buildings in Munster.

We surface candidates from Tailte Éireann property data, Overture building footprints, and the SEAI register — filtered by roof area, building type, and grid-zone heuristics before any installer ever sees them.

02 · Model

Exact panel layout and 25-year economics.

Each lead gets a building-level Google Solar API model, the SEAI Non-Domestic Microgen grant applied, commercial day rate and 19.5c export tariff factored in, and a 30% derate for real-install constraints — setbacks, plant equipment, structural limits, MIC headroom. The number a prospect sees is what they could realistically install, not the theoretical maximum.

Portrait crop of the same lead pack panel layout.

Lead pack · 2026-05

Lead pack · 04 of 28

Pharma facility · Limerick

Active

Decision-maker: Facilities Manager named, LinkedIn-verified

Why now: Planning permission for plant expansion · 2024-09

Grid context: ESB Networks · Limerick MV · MIC ~800 kVA estimated

~777 kWp · €1.0M NPV · 6-yr payback

03 · Deliver

Business identity, decision-maker, grid context.

Every lead arrives with the business identified, the operational decision-maker named where we can resolve them, recent planning or expansion signals as "why now," and an editable outreach draft pre-filled with the building's economics. The data you need to qualify and act, not just admire.

04 · Example pack

A real Munster lead, anonymised.

Same building you've seen at the top of this page. These are the numbers we shipped to the installer.

Installable

777

kWp · after a 30% real-install derate

Same pack, anonymised

A 30,000 m² pharma roof in Limerick. Same model we'd ship you.

Example · numbers rounded

Annual yield

~830MWh

25-yr NPV

~€1.0M

Payback

~6years

After SEAI grant · vs 25-yr lifespan

05 · Munster focus

Tier-2 and tier-3 installers in Munster don't have a national marketing pipeline.

The Irish commercial solar market is shaped by one national player in Dublin, which runs its own marketing pipeline. Installers in Cork, Limerick, Tipperary, Kerry, Clare, and Waterford don't have an equivalent lead source — they compete on referrals and cold outreach against a market that already knows the value of solar.

Klade closes that gap. We focus on the six Munster counties and the six-to-ten SEAI-registered installers who are the right size to act on a steady flow of qualified leads.

Cork · Limerick · Tipperary · Kerry · Clare · Waterford

For installers

Currently in private beta with select Munster installers.

Email us about the beta

6–10 SEAI-registered partners · Cork → Waterford